NAME OF APPLICANT: ExxonMobil Pipeline Company, c/o Wood Group USA, Inc., Attn: Mr. Gary B. Allison, 17325 Park Row, Houston, Texas 77084.
LOCATION OF WORK: There are five segments of work under this permit: LA-58B, POB 30.3955, -91.2068, POE 30.1730, -90.7887, East Baton Rouge and Ascension Parish; LA-58C, POB 30.2387, -91.0116, POE 30.2119, -91.0353, Ascension Parish; LA-92B, POB 30.3667, - 91.1560, POE 30.2235, -91.0582, East Baton Rouge and Ascension Parish; LA-93B, POB 30.3667, -91.1560, POE 30.2235, -91.0582, East Baton Rouge and Ascension Parish; LA-114, POB 30.1726, -90.7889, POE -91.2032, Ascension and West Baton Rouge Parish, near Baton Rouge, Louisiana, as shown on the attached vicinity map.
CHARACTER OF WORK: Clear rights-of-ways, grade, conduct trenching operations, perform horizontal directional drills, temporarily stockpile and backfill with approximately 1,048,941 cubic yards of native earthen material, approximately 1,260 cubic yards of hauled in clean native material, approximately 578 cubic yards of gravel, and approximately 125 cubic yards of concrete; all as necessary to install, operate and maintain 32.6 miles of 8-inch propane pipeline, 2.8 miles of 8-inch propane pipeline, 44.5 miles of 8-inch polymer grade propylene pipeline, 14.0 miles of 4-inch butylene pipeline and 14.0 miles of 4-inch iso-butane pipeline as shown on the attached drawings. Project implementation would impact approximately 72.73 acres of jurisdictional wetlands through conversion to herbaceous wetlands, 171.66 acres through temporary construction activities, and 0.63 acres through permanent fill activities. The applicant proposes to purchase compensatory mitigation acres at CEMVN approved mitigation banks in the area.