Results:
Archive: June, 2020
Clear
  • Mississippi River flood fight operations end

    After 176 days, water levels along the Mississippi River have dropped below 11 feet at the Carrollton Gage prompting the U.S. Army Corps of Engineers, New Orleans District to close out flood fight efforts today.
  • Corps seeks public comments for St. Tammany feasibility study

    The Notice of Intent for the St. Tammany Parish, Louisiana Feasibility Study was published on the Federal Register June 19, 2020 and the Corps of Engineers is seeking public comment for the study. The Corps will host virtual meetings to receive public comments; time and location to follow in subsequent media release and advertisements. Written comments will be accepted through August 3, 2020 when the comment period ends.
  • Temporary Closure: USACE Calcasieu River Saltwater Barrier

    Structure to be closed from June 17 to July 11 for navigation gate dewatering