Results:
Archive: May, 2020
Clear
  • Temporary closure of Almonaster Ave. NB at Florida Ave. with detour on Florida Ave.

    U.S. Army Corps of Engineers, New Orleans District will temporarily close Almonaster Ave. northbound at Florida Ave. and apply traffic control restrictions on Florida Ave. between Franklin Ave. and Almonaster Ave. The closure will be in effect Monday, June 1 through Saturday, August 1, 2020.
  • Port of New Orleans Access Channel Deepening Project virtual public meeting scheduled

    The U.S. Army Corps of Engineers, New Orleans District, has scheduled a virtual public meeting regarding the Port of New Orleans Access Channel Deepening Feasibility Study (PONO) at 1 p.m. on Wednesday, May 20, 2020.
  • Corps Deactivates Phase II Flood Fight

    Water levels along the Mississippi River have dropped prompting the U.S. Army Corps of Engineers, New Orleans District to move from Phase II to Phase I flood fight procedures.
  • Army Corps closes final bays at Bonnet Carré Spillway

    Based on the reduced flows in the Mississippi River at Red River Landing, the U.S. Army Corps of Engineers, New Orleans District closed the final bays of the Bonnet Carré Spillway Friday, May 1. Although water levels are receding, allowing the structure’s closure, the Mississippi River in the New Orleans District’s area of responsibility remains elevated. Army Corps personnel will continue flood fight inspections alongside local levee districts and all levee and excavation restrictions remain in effect.