Approved Independent External Peer Review (IEPR) Reports

 Greater New Orleans Hurricane and Storm Damage Risk Reduction (GNOHSDRRS) Design Guidelines
 Greater New Orleans Hurricane and Storm Damage Risk Reduction (GNOHSDRRS) Inner Harbor Navigation Canal (IHNC-02), Lake Borgne Protection Project
 Final Independent External Peer Review Report Decision and Implementation Documents for Environmental Mitigation for Lake Pontchartrain and Vicinity, Hurricane and Storm Damage Risk Reduction System Louisiana
 Independent External Peer Review Report for the Decision and Implementation Documents for Environmental Mitigation for West Bank and Vicinity, New Orleans, Louisiana, Hurricane and Storm Damage Risk Reduction System
 Greater New Orleans Hurricane and Storm Damage Risk Reduction System (GNOHSDRRS) West Bank and Vicinity (WBV) 14c.2, New Westwego Pump Station to Orleans Village, 3rd Enlargement, Phase 1
 Greater New Orleans Hurricane and Storm Damage Risk Reduction System (GNOHSDRRS) : Armoring Research Summary and Armoring Guidance Manual
 Greater New Orleans Hurricane and Storm Damage Risk Reduction System (GNOHSDRRS) Gulf Intracoastal Waterway - West Closure Complex (GIWW-WCC)
 Greater New Orleans Hurricane and Storm Damage Risk Reduction System (GNOHSDRRS) Design Elevation Report and Addendum
 Greater New Orleans Hurricane and Storm Damage Risk Reduction System (GNOHSDRRS) Crossings with I-10 and I-310, Lake Pontchartrain and Vicinity (LPV) 03.2a and 06e.2
 Greater New Orleans Hurricane and Storm Damage Risk Reduction System (GNOHSDRRS) West Bank and Vicinity (WBV) Project Description Document (PDD) and Individual Environmental Report (IER) for providing 100-year Level of Risk Reduction to the Harvey-Algiers

 

 
 Calcasieu River and Pass, LA, Dredged Material Management Plan/Supplemental Evnironmental Impact Statement, Peer Review Plan (PRP)
 Greater New Orleans Hurricane and Storm Damage Risk Reduction System (GNOHSDRRS) West Bank and Vicinity (WBV) - 14e.2 - V-Line Levee, East of Vertex - Phase 2
 Hurricane Isaac With and Without 2012 100-Year HSDRRS Evaluation

 

 Greater New Orleans Hurricane and Storm Damage Risk Reduction System (GNOHSDRRS) Design Guidelines: Aberrant Barge Impact Loads on Hurricane and Storm Damage Risk Reduction System Floodwalls

        Planning Center of Expertise (PCX) Memo
        Final IEPR Report
        USACE IEPR Response Report
        MVD Approval Memo

 

 Greater New Orleans Hurricane and Storm Damage Risk Reduction System (GNOHSDRRS) Lake Pontchartrain & Vicinity (LPV) 109.02a - New Orleans East Levee, Southpoint to CSX Railroad
 Greater New Orleans Hurricane and Storm Damage Risk Reduction System (GNOHSDRRS) Design Guidelines: Spiral Welded Pipe (SWP) Piles for Coastal Structures
 Greater New Orleans Hurricane and Storm Damage Risk Reduction System (GNOHSDRRS)Lake Pontchartrain and Vicinity (LPV)111.01 - Deep Soil Mixing Design Guidelines