Public Notices Overview

ALL projects are sorted by issuance date. The public notices and drawings are in PDF formatted files. You must have Adobe Acrobat Reader installed on your PC to view the files. If you don't have it, you may download it free from www.adobe.com.  

Instant Notification of New Public Notices:  Click on the green RSS button to the right to receive automatic e-mail updates. If you wish to subscribe you need an RSS app installed on your device. Please note that all web browsers do not support RSS feeds.

Viewing Notices. To view a Public Notice and its associated Drawings file (if any), click on the "Public Notice" or "Public Notice and Drawings" link and any additional links included in the attachments section. To download a file to your PC, right-click on the link, then select "Save Target As" from the menu. To view other Corps District's public notices click here,.

How to send comments. Comments can be mailed to the address appearing in the Public Notice or emailed to the Project Manager identified on the Public Notice. Comments made in reference to a Public Notice should include your name, address, and phone number as well as the permit application number identified on the Public Notice. 

Individuals or parties may request an extension of time in which to comment on the proposed work by writing to the project manager or clicking on the project manager’s name on the public notice grid on the web page.  Any request must be specific and substantively supportive of the requested extension, and received by this office prior to the end of the initial comment period.  The Branch Chief will review the request and the requestor will be promptly notified of the decision to grant or deny the request.  If granted, the time extension will be continuous to the initial comment period and, inclusive of the initial comment period, will not exceed a total of 30 calendar days.

To view issued or pending individual permits, click here.

Appeals of Jurisdictional Determinations and Proffered or Denied Permits. To view a table of administrative appeals within the Mississippi Valley Division, click here.

MVN-2007-01199-CX

Published Dec. 3, 2018
Expiration date: 1/1/2019

NAME OF APPLICANT:  L.J. Noel, Inc., c/o Lord and Winter, LLC, Attn: Sarah Wood, 9800 Airline Highway, Suite 207, Baton Rouge, Louisiana 70816

LOCATION OF WORK:  Within the Mississippi River Basin, in the Lower Mississippi River – Baton Rouge hydrologic unit (HUC 08070100), in the Mississippi River, right descending bank, mile 184.5, near Modeste, Louisiana, in Ascension Parish (Latitude 30.1866 N, Longitude -91.0227 W).

CHARACTER OF WORK:  The applicant has requested an extension of time to complete previously authorized work and to modify an existing Department of the Army permit authorization.  The proposed permit modification includes the installation and maintenance of a conveyor bridge, 6 dolphin moorings, 14 deadman anchors, and barge fleeting.  The proposed conveyor bridge would be utilized to transport sand material to barges from the existing and previously authorized sand containment pits.  The dolphin moorings would be utilized for barges during loading.  The proposed anchors would be utilized to support a 14 barge long x 8 barge wide fleeting arrangement (112 total barges).  Jurisdictional batture wetlands would be impacted from the proposed modification from construction of the conveyor bridge and support footings, as well as the temporary 15-wide construction access clearing for the installation of the anchor point installation along the batture.  The original permit authorization included the dredging of sand material from the Mississippi River and the placement of dredged material into batture containment pits (2 of 4 pits have been completed).  Approximately 2,000,000 cubic yards of sand material annually would be hydraulically dredged from the river bottom and would be placed in the batture pit for stockpiling.  Approximately 0.12 acre of jurisdictional batture wetlands would be impacted by permit modification and 2.06 acres of jurisdictional batture wetlands would be cleared for access road and anchor point installation.  The 4 previously authorized batture containment pits have been previously mitigated under the original permit authorization.

The applicant stated that the impacted area has been minimized to the smallest footprint that will allow the goals of the project to be achieved.  Best management practices will be employed during construction to minimize sediment excursion.  To compensate for unavoidable impacts, the applicant has agreed to purchase mitigation credits from an approved mitigation bank for all proposed modifications impacting jurisdictional wetlands.