Public Notices Overview

ALL projects are sorted by issuance date. The public notices and drawings are in PDF formatted files. You must have Adobe Acrobat Reader installed on your PC to view the files. If you don't have it, you may download it free from www.adobe.com.  

Instant Notification of New Public Notices:  Click on the green RSS button to the right to receive automatic e-mail updates. If you wish to subscribe you need an RSS app installed on your device. Please note that all web browsers do not support RSS feeds.

Viewing Notices. To view a Public Notice and its associated Drawings file (if any), click on the "Public Notice" or "Public Notice and Drawings" link and any additional links included in the attachments section. To download a file to your PC, right-click on the link, then select "Save Target As" from the menu. To view other Corps District's public notices click here,.

How to send comments. Comments can be mailed to the address appearing in the Public Notice or emailed to the Project Manager identified on the Public Notice. Comments made in reference to a Public Notice should include your name, address, and phone number as well as the permit application number identified on the Public Notice. 

Individuals or parties may request an extension of time in which to comment on the proposed work by writing to the project manager or clicking on the project manager’s name on the public notice grid on the web page.  Any request must be specific and substantively supportive of the requested extension, and received by this office prior to the end of the initial comment period.  The Branch Chief will review the request and the requestor will be promptly notified of the decision to grant or deny the request.  If granted, the time extension will be continuous to the initial comment period and, inclusive of the initial comment period, will not exceed a total of 30 calendar days.

To view issued or pending individual permits, click here.

Appeals of Jurisdictional Determinations and Proffered or Denied Permits. To view a table of administrative appeals within the Mississippi Valley Division, click here.

MVN-2023-00199-ECS

CEMVN-RGE
Published Sept. 18, 2023
Expiration date: 10/18/2023

NAME OF APPLICANT: Edison Chouest Offshore, c/o: GIS Engineering, LLC, Attn.:
Mr. Mohen Menon, 450 Laurel Street, Ste. 1500, Baton Rouge, LA 70801.

LOCATION OF WORK: Located on the westbank bank or right descending bank of the Mississippi River near mile marker 53 and adjacent to Louisiana Highway 23, Port Sulfur, in Plaquemines Parish, Louisiana, (lat. 29.598481, long. -89.853215), as shown on the attached drawings. (Hydrologic Unit Code: 08090301; Lower Mississippi River and 08070100; Mississippi River Basin).

CHARACTER OF WORK: The proposed project includes the clearing, grading, excavating, and depositing fill for the construction of a road, bridge, gangway, and dock that will support the proposed Galliano Marine Plaquemines Dock. The purpose of the project is to assist with the restocking and refueling of tugboats as they travel through the Mississippi River. The project as proposed would directly impact 1.039 acres (permanently) of jurisdictional wetlands.