APPLICANT: Kimberly Goslin
Air Products Blue Energy LLC
305 East Louisiana Highway 30
Gonzales, Louisiana 70737
AGENT: Steve Leach
AECOM Technical Service, Inc.
8555 United Plaza Boulevard
Suite 300
Baton Rouge, Louisiana 70809
LOCATION OF WORK: The project would affect waters of the United States and navigable waters of the United States associated with jurisdictional wetlands and waterways in and/or adjacent and/or connected to the Mississippi River, Panama Canal, Bayou Conway, Blind River, Pipeline Canal, Bayou Shepherd, Hope Canal, Mississippi Bayou, Reserve Relief Canal, and Lake Maurepas. The project/review area includes the proposed ammonia plant and dock located on the Mississippi River, Mile Point 169.5, 41509 Louisiana Highway 22, Sorrento, Ascension Parish, Louisiana at Latitude 30.139161 and Longitude -90.904478. The pipelines and associated structures are proposed to begin at the requested ammonia plant and continue through Saint James Parish, Saint John the Baptist Parish, Livingston Parish, and Tangipahoa Parish ending at proposed injection wells in Lake Maurepas at Latitude 30.303022, Longitude -90.475303.
PROJECT PURPOSE:
Basic: Industrial infrastructure
Overall: To produce ammonia and hydrogen and to inject the carbon dioxide byproduct into underground wells.
PROPOSED WORK: The applicant requests authorization to excavate, clear, grade, and deposit fill for an ammonia and hydrogen production facility, dock, hydrogen pipeline, carbon dioxide pipelines, natural gas pipelines, access roads, laydown areas, and wells to inject and sequester carbon dioxide. Temporary impacts for construction ROWs will include 213.69 acres of jurisdictional wetlands and 93.71 acres of waters of the U.S. Permanent impacts for facilities and pipelines will include 149.34 acres of jurisdictional wetlands and 26.67 acres of waters of the U.S.