Public Notices Overview

ALL projects are sorted by issuance date. The public notices and drawings are in PDF formatted files. You must have Adobe Acrobat Reader installed on your PC to view the files. If you don't have it, you may download it free from www.adobe.com.  

Instant Notification of New Public Notices:  Click on the green RSS button to the right to receive automatic e-mail updates. If you wish to subscribe you need an RSS app installed on your device. Please note that all web browsers do not support RSS feeds.

Viewing Notices. To view a Public Notice and its associated Drawings file (if any), click on the "Public Notice" or "Public Notice and Drawings" link and any additional links included in the attachments section. To download a file to your PC, right-click on the link, then select "Save Target As" from the menu. To view other Corps District's public notices click here,.

How to send comments. Comments can be mailed to the address appearing in the Public Notice or emailed to the Project Manager identified on the Public Notice. Comments made in reference to a Public Notice should include your name, address, and phone number as well as the permit application number identified on the Public Notice. 

Individuals or parties may request an extension of time in which to comment on the proposed work by writing to the project manager or clicking on the project manager’s name on the public notice grid on the web page.  Any request must be specific and substantively supportive of the requested extension, and received by this office prior to the end of the initial comment period.  The Branch Chief will review the request and the requestor will be promptly notified of the decision to grant or deny the request.  If granted, the time extension will be continuous to the initial comment period and, inclusive of the initial comment period, will not exceed a total of 30 calendar days.

To view issued or pending individual permits, click here.

Appeals of Jurisdictional Determinations and Proffered or Denied Permits. To view a table of administrative appeals within the Mississippi Valley Division, click here.

MVN-2016-001526-CQ

PN ALL
Published July 4, 2022
Expiration date: 7/23/2022

NAME OF APPLICANT:  Shintech Louisiana, LLC, c/o Providence Engineering and Environmental Group, LLC, Attn: Regina Staten, 1201 Main Street, Baton Rouge, LA 70802.      

 LOCATION OF WORK:  In an approximate previously authorized 849.84-acre site located along and northwest of LA Hwy 405 (River Road), approximately 5.3 miles southeasterly of Plaquemine, in Iberville Parish, within the Terrebonne Basin in hydrologic unit (HUC 08070300), as shown on the attached drawings (Latitude 30.238053 N, Longitude -91.160229 W).   

CHARACTER OF WORK: The applicant has requested a modification to an existing Department of the Army authorization to clear, grade, excavate and deposit fill to construct access roads, parking areas, utility pipelines, rail storage yard, and other appurtenant structures to modify the existing SPP-1 and SPP-3 Shintech facilities.  Approximately 106,500 cubic yards of clean hauled in dirt fill and 164,800 cubic yards of hauled in limestone material, would be placed as fill material in jurisdictional areas.  The proposed permit modification would impact approximately 0.24 acre of jurisdictional herbaceous wetlands from fill placement.  All previous wetland impacts have been mitigated for from the original permit authorization. The applicant proposes to utilize best management practices for erosion and siltation control during and after the construction phase of the project. The applicant claims that the proposed project has been designed to avoid and minimize direct and secondary adverse impacts to the maximum extent practicable and has limited the new impacts associated with this project to low quality wet pasture wetland habitat and is not proposing any additional impacts to forested wetlands not previously mitigated for from previous permit actions.  If authorized, the project will receive approval from all appropriate local drainage authorities and sewerage agencies. As compensation for unavoidable wetland impacts, the applicant proposes to use a Corps approved mitigation bank within the watershed of impact.