Public Notices Overview

ALL projects are sorted by issuance date. The public notices and drawings are in PDF formatted files. You must have Adobe Acrobat Reader installed on your PC to view the files. If you don't have it, you may download it free from www.adobe.com.  

Instant Notification of New Public Notices:  Click on the green RSS button to the right to receive automatic e-mail updates. If you wish to subscribe you need an RSS app installed on your device. Please note that all web browsers do not support RSS feeds.

Viewing Notices. To view a Public Notice and its associated Drawings file (if any), click on the "Public Notice" or "Public Notice and Drawings" link and any additional links included in the attachments section. To download a file to your PC, right-click on the link, then select "Save Target As" from the menu. To view other Corps District's public notices click here,.

How to send comments. Comments can be mailed to the address appearing in the Public Notice or emailed to the Project Manager identified on the Public Notice. Comments made in reference to a Public Notice should include your name, address, and phone number as well as the permit application number identified on the Public Notice. 

Individuals or parties may request an extension of time in which to comment on the proposed work by writing to the project manager or clicking on the project manager’s name on the public notice grid on the web page.  Any request must be specific and substantively supportive of the requested extension, and received by this office prior to the end of the initial comment period.  The Branch Chief will review the request and the requestor will be promptly notified of the decision to grant or deny the request.  If granted, the time extension will be continuous to the initial comment period and, inclusive of the initial comment period, will not exceed a total of 30 calendar days.

To view issued or pending individual permits, click here.

Appeals of Jurisdictional Determinations and Proffered or Denied Permits. To view a table of administrative appeals within the Mississippi Valley Division, click here.

MVN-2014-01615-WLL

PN ALL
Published Oct. 25, 2021
Expiration date: 11/8/2021

NAME OF APPLICANT: Shell Pipeline Company, LP, c/o: T. Baker Smith, LLC, P.O. Box 2266, Houma, Louisiana 70361.

LOCATION OF WORK: Located in Terrebonne Parish, Section 0, Township 00S and Range 00E, located off of Shell’s existing Ship Shoal Pipeline, near Hellhole Bayou, Bay Junop, Fiddler’s Lake, Buckskin Bayou and Eagle Lake, centrally located at (lat. 29 13 24.35, long. -91 4 39.43), as shown within the attached drawings.

CHARACTER OF WORK: Install timber supported gates within waterways crossing the Shell Ship Shore Pipeline to prevent access. Gates are proposed at five (5) locations along the pipeline canal. The proposed project does not include a discharge of fill material or include wetland impacts or effects to special aquatic sites. The applicant has not proposed to provide compensatory mitigation, as there are no plans to impact wetland resources through project construction.