Public Notices Overview

ALL projects are sorted by issuance date. The public notices and drawings are in PDF formatted files. You must have Adobe Acrobat Reader installed on your PC to view the files. If you don't have it, you may download it free from www.adobe.com.  

Instant Notification of New Public Notices:  Click on the orange RSS button to the right to receive automatic e-mail updates. If you wish to subscribe you need an RSS app installed on your device. Please note that all web browsers do not support RSS feeds.

Viewing Notices. To view a Public Notice and its associated Drawings file (if any), click on the "Public Notice" or "Public Notice and Drawings" link and any additional links included in the attachments section. To download a file to your PC, right-click on the link, then select "Save Target As" from the menu. To view other Corps District's public notices click here,.

How to send comments. Comments can be mailed to the address appearing in the Public Notice or emailed to the Project Manager identified on the Public Notice. Comments made in reference to a Public Notice should include your name, address, and phone number as well as the permit application number identified on the Public Notice. 

Individuals or parties may request an extension of time in which to comment on the proposed work by writing to the project manager or clicking on the project manager’s name on the public notice grid on the web page.  Any request must be specific and substantively supportive of the requested extension, and received by this office prior to the end of the initial comment period.  The Branch Chief will review the request and the requestor will be promptly notified of the decision to grant or deny the request.  If granted, the time extension will be continuous to the initial comment period and, inclusive of the initial comment period, will not exceed a total of 30 calendar days.

To view issued or pending individual permits, click here.

Appeals of Jurisdictional Determinations and Proffered or Denied Permits. To view a table of administrative appeals within the Mississippi Valley Division, click here.

MVN-2021-00741-MG

PN ALL
Published Sept. 13, 2021
Expiration date: 10/2/2021

NAME OF APPLICANT: Southland Environmental, L.L.C., obo Lake Charles Harbor and Terminal District; Attn: Jared King; 510 Clarence Street, Lake Charles, Louisiana 70601.

LOCATION OF WORK:  A 2.5-acre site off of the Bayou D’ Inde Road and along the Calcasieu River, in Sections 16 and 17, Township 10 South, Range 9 West, Calcasieu Parish Louisiana, as shown on attached drawings.

Center of Location: Latitude: 30.191325° N, Longitude: -93.299558° W. 

Hydrologic Unit Code: 08080206 – Lower Calcasieu, Calcasieu River Basin.

CHARACTER OF WORK:   Installation of a new bulkhead and storm water collection system at the Bulk Terminal #1 Facility Dock along the Calcasieu River in Westlake, Louisiana. The new bulkhead is proposed for erosion protection and infrastructure for the storm water collection system.  The purpose of the storm water collection system is the containment of coke particulates to the Bulk Terminal #1 site and prevention of impacts to the Calcasieu River watershed. Work includes backfilling with 12,500 cubic yards of earthen material, 2,800 cubic yards of concrete material, and 4,100 cubic yards of aggregate material.  Approximately 1.17 acres of permanent scrub shrub impacts and 0.7 acres of impacts to Waters of the United States are proposed.  If a Department of the Army permit is warranted, the applicant has proposed to mitigate unavoidable wetlands impacts at an approved mitigation bank within the New Orleans District.