Public Notices Overview

ALL projects are sorted by issuance date. The public notices and drawings are in PDF formatted files. You must have Adobe Acrobat Reader installed on your PC to view the files. If you don't have it, you may download it free from www.adobe.com.  

Instant Notification of New Public Notices:  Click on the orange RSS button to the right to receive automatic e-mail updates. If you wish to subscribe you need an RSS app installed on your device. Please note that all web browsers do not support RSS feeds.

Viewing Notices. To view a Public Notice and its associated Drawings file (if any), click on the "Public Notice" or "Public Notice and Drawings" link and any additional links included in the attachments section. To download a file to your PC, right-click on the link, then select "Save Target As" from the menu. To view other Corps District's public notices click here,.

How to send comments. Comments can be mailed to the address appearing in the Public Notice or emailed to the Project Manager identified on the Public Notice. Comments made in reference to a Public Notice should include your name, address, and phone number as well as the permit application number identified on the Public Notice. 

Individuals or parties may request an extension of time in which to comment on the proposed work by writing to the project manager or clicking on the project manager’s name on the public notice grid on the web page.  Any request must be specific and substantively supportive of the requested extension, and received by this office prior to the end of the initial comment period.  The Branch Chief will review the request and the requestor will be promptly notified of the decision to grant or deny the request.  If granted, the time extension will be continuous to the initial comment period and, inclusive of the initial comment period, will not exceed a total of 30 calendar days.

To view issued or pending individual permits, click here.

Appeals of Jurisdictional Determinations and Proffered or Denied Permits. To view a table of administrative appeals within the Mississippi Valley Division, click here.

MVN-2020-00158-WLL

Published May 11, 2020
Expiration date: 5/30/2020

Name of Applicant:  DTE louisiana gaterhing, LLC, c/o Mott MacDonald, Attn: Mr. Justin Miner, 5295 South Commerce Drive, Suite 500, Murray, UT 84107

Location of Work:  The proposed 3.8-mile natural gas pipeline will begin at an interconnect with an existing third-party pipeline system near the Cheniere/Gillis facility (Lat: 30.450593oN, Long: 93.149108oW) and transport natural gas to the project terminus at the Louisiana Storage/Cameron interconnect site (Lat: 30.438619oN, Long: 93.208999oW) in Ragley, Louisiana, within Beauregard Parish, and is in the Upper Calcasieu (08080203) watershed, outside of the coastal zone, as shown in the attached drawings.

Character of Work:  The applicant has requested Department of the Army authorization to install, operate and maintain a 20-inch diameter natural gas pipeline that will include the construction of a launcher/receiver facility at the origin of the pipeline and an interconnect facility at the terminus of the pipeline, with existing permanent access roads to each facility site, and two existing temporary access roads for construction.  The project activities include clearing the right-of-way, conducting trenching operations, installing various above and below ground pipeline and components, installing aboveground facilities, temporarily stockpiling materials, and performing horizontal directional drilling (HDD) and/or conventional boring operations.  Following construction, areas temporarily impacted by the project will be restored to pre-construction grade and allowed to revegetate. The area within the permanent right-of-way easement will be maintained throughout the operation of the pipeline as herbaceous habitat.