Public Notices Overview

ALL projects are sorted by issuance date. The public notices and drawings are in PDF formatted files. You must have Adobe Acrobat Reader installed on your PC to view the files. If you don't have it, you may download it free from www.adobe.com.  

Instant Notification of New Public Notices:  Click on the orange RSS button to the right to receive automatic e-mail updates. If you wish to subscribe you need an RSS app installed on your device. Please note that all web browsers do not support RSS feeds.

Viewing Notices. To view a Public Notice and its associated Drawings file (if any), click on the "Public Notice" or "Public Notice and Drawings" link and any additional links included in the attachments section. To download a file to your PC, right-click on the link, then select "Save Target As" from the menu. To view other Corps District's public notices click here,.

How to send comments. Comments can be mailed to the address appearing in the Public Notice or emailed to the Project Manager identified on the Public Notice. Comments made in reference to a Public Notice should include your name, address, and phone number as well as the permit application number identified on the Public Notice. 

Individuals or parties may request an extension of time in which to comment on the proposed work by writing to the project manager or clicking on the project manager’s name on the public notice grid on the web page.  Any request must be specific and substantively supportive of the requested extension, and received by this office prior to the end of the initial comment period.  The Branch Chief will review the request and the requestor will be promptly notified of the decision to grant or deny the request.  If granted, the time extension will be continuous to the initial comment period and, inclusive of the initial comment period, will not exceed a total of 30 calendar days.

To view issued or pending individual permits, click here.

Appeals of Jurisdictional Determinations and Proffered or Denied Permits. To view a table of administrative appeals within the Mississippi Valley Division, click here.

MVN-2016-00717-MR

Published April 1, 2019
Expiration date: 4/30/2019

NAME OF APPLICANT: A.S.H. Mitigation LLC; Care of: Pangea Conservation & Compliance LLC; Attention: Leonard McCauley; P.O. Box 40345; Baton Rouge, Louisiana 70835.

LOCATION OF WORK:  The 246.2 acre site is located approximately 11.5 miles northwest of Clinton Louisiana, on Perkins Road, in East Feliciana Parish as shown on attached drawings (Latitude: 30.991517° N, Longitude:–90.899159° W).  The Project is located within the Lake Pontchartrain Basin, Hydrologic Unit 080070202.

CHARACTER OF WORK:   Existing shallow farm drains will be filled or reshaped to create swales using material from adjacent spoil banks and fields. An appropriate assemblage of bottomland hardwood species will be established through plantings and natural recruitment on the site.  All work is being done for the purpose of constructing a mitigation bank.