Public Notices Overview

ALL projects are sorted by issuance date. The public notices and drawings are in PDF formatted files. You must have Adobe Acrobat Reader installed on your PC to view the files. If you don't have it, you may download it free from www.adobe.com.  

Instant Notification of New Public Notices:  Click on the orange RSS button to the right to receive automatic e-mail updates. If you wish to subscribe you need an RSS app installed on your device. Please note that all web browsers do not support RSS feeds.

Viewing Notices. To view a Public Notice and its associated Drawings file (if any), click on the "Public Notice" or "Public Notice and Drawings" link and any additional links included in the attachments section. To download a file to your PC, right-click on the link, then select "Save Target As" from the menu. To view other Corps District's public notices click here,.

How to send comments. Comments can be mailed to the address appearing in the Public Notice or emailed to the Project Manager identified on the Public Notice. Comments made in reference to a Public Notice should include your name, address, and phone number as well as the permit application number identified on the Public Notice. 

Individuals or parties may request an extension of time in which to comment on the proposed work by writing to the project manager or clicking on the project manager’s name on the public notice grid on the web page.  Any request must be specific and substantively supportive of the requested extension, and received by this office prior to the end of the initial comment period.  The Branch Chief will review the request and the requestor will be promptly notified of the decision to grant or deny the request.  If granted, the time extension will be continuous to the initial comment period and, inclusive of the initial comment period, will not exceed a total of 30 calendar days.

To view issued or pending individual permits, click here.

Appeals of Jurisdictional Determinations and Proffered or Denied Permits. To view a table of administrative appeals within the Mississippi Valley Division, click here.

MVN-2006-02841-CM

Published Jan. 14, 2019
Expiration date: 2/4/2019

NAME OF APPLICANT:  DR Horton, Gulf Coast, c/o Hydrik Wetlands Consultants, Attn: Mike Henry, 2323 Hwy. 190 East, Suite 2, Hammond, LA 70401.

LOCATION OF WORK:  Approximately 1.6 miles north of Hwy 190, on Duff Rd. in Walker Louisiana, in Livingston Parish, within the Lake Pontchartrain Basin in hydrologic unit (HUC 08070202), as shown on the attached drawings. 

CHARACTER OF WORK:  The applicant has requested Department of the Army authorization to clear, grade, excavate, and place fill and aggregate material for the construction of a residential subdivision (Foxglove) to include 322 residential lots, 4 storm water detention ponds, 2 recreational areas, drainage and utility improvements, roadways, green space, 3 concrete culverts, a sewerage treatment plant, and ingress egress.  Approximately 280,000 cubic yards of excavated fill from onsite and concrete aggregate material will be deposited to complete the project.  The proposed project is situated on and approximately 142-acre tract that has been determined to contain approximately 23.5 acres of forested wetlands. Approximately 16.7 acres of wetlands will remain undisturbed, approximately 6.6 acres of forested wetlands will be permanently impacted, and approximately 0.34 acres of other waters of the U.S. will be permanently impacted.  An earlier permit was issued at this site on April 20, 2007 with the same Corps permit number for this subdivision (Foxglove) to Weyerhaeuser Real Estate Development Company (‘Weyerhaeuser’).  Weyerhaeuser received two time extension on their permit, April 18, 2012 and October 2, 2015.  Presently, the only work performed was the installation of three concrete road crossing culverts within the development.  Weyerhaeuser subsequently transferred their permit to DR Horton, Gulf Coast in October of 2018.  DR Horton, Gulf Coast has requested a modification to the original authorization and a time extension to complete work.  Changes include an increase in the number of home lots, detention ponds, and impacts to wetlands onsite.  The original authorization permitted impacts to approximately 2.43 acres of forested wetlands which compensatory mitigation was provided.  The new subdivision plan and lay out will add an additional 4.2 acres of forested wetland impacts making the total impacts to forested wetlands 6.6 acres.  

        The applicant stated that the proposed project has been designed to avoid and minimize direct and secondary adverse impacts to the maximum extent practicable.  Any further reduction would limit usage of the property deeming the project impracticable.  As compensation for unavoidable wetland impacts, the applicant proposes to mitigate in-kind wetland credits from a Corps approved mitigation bank located in the watershed.