Results:
Tag: Phase II
Clear
  • Corps Deactivates Phase II Flood Fight

    Water levels along the Mississippi River have dropped prompting the U.S. Army Corps of Engineers, New Orleans District to move from Phase II to Phase I flood fight procedures.
  • Corps begins next phase of inspections along Mississippi River

    The Mississippi River has risen to 15 feet at the Carrollton Gage prompting the U.S. Army Corps of Engineers, New Orleans District to reactivate phase II flood fight procedures.
  • Corps Begins Next Phase of Inspections along the Mississippi River

    The Mississippi River has risen to 15 feet at the Carrollton Gage prompting the U.S. Army Corps of Engineers, New Orleans District to reactivate phase II flood fight procedures. Closely coordinating efforts with the local levee authorities, the New Orleans District will begin daily patrolling of levees along the Mississippi River from Baton Rouge to Venice. Increased patrols help ensure our ability to respond quickly to any problem areas that may develop along the levee system because of the elevated water levels.
  • Corps begins next phase of inspections along Mississippi River

    The Mississippi River has risen to 15 feet at the Carrollton Gage prompting the U.S. Army Corps of Engineers, New Orleans District to activate phase II flood fight procedures.
  • Corps deactivates Phase II Flood Fight

    NEW ORLEANS – Water levels along the Mississippi River have dropped prompting the U.S. Army Corps of Engineers, New Orleans District to move from Phase II to Phase I Flood Fight procedures.
  • Corps deactivates Phase II Flood Fight

    Water levels along the Mississippi River have dropped prompting the U.S. Army Corps of Engineers, New Orleans District to move from Phase II to Phase I Flood Fight procedures.
  • Corps begins next phase of inspections along Mississippi River

    The Mississippi River at the Carrollton Gage has risen to 15.0 feet prompting the U.S. Army Corps of Engineers, New Orleans District to activate Phase II flood fight procedures. During Phase II, the Corps works with the local levee districts to conduct daily inspections of the Mississippi River levees.
  • Corps awards Orleans Parish interior drainage contract Claiborne Avenue – Phase II

    NEW ORLEANS -The U.S. Army Corps of Engineers recently awarded a contract to provide increased