DATE OF PREDICTION
River Miles Above Head of Passes (AHP) in the Mississippi River
March 3, 2026
TOE OF WEDGE ESTIMATED LOCATION
River Mile 20.3 AHP
DATE AND LOCATION OF LAST FIELD MEASUREMENT
March 2, 2026
River Mile 23.7 AHP
NOTE: Historical data indicate that surface water quality will exceed the Environmental Protection Agency public water supply standard of 250 ppm chloride approximately 15 to 25 miles downstream of the wedge toe.
Point of Contact for this page: Lower Mississippi River & Tributaries Engineering Branch CEMVN-ED-R New Orleans, LA 70160 CEMVN-Water-Management@usace.army.mil