Public Notices Overview

ALL projects are sorted by issuance date. The public notices and drawings are in PDF formatted files. You must have Adobe Acrobat Reader installed on your PC to view the files. If you don't have it, you may download it free from www.adobe.com.  

Instant Notification of New Public Notices:  Click on the orange RSS button to the right to receive automatic e-mail updates. If you wish to subscribe you need an RSS app installed on your device. Please note that all web browsers do not support RSS feeds.

Viewing Notices. To view a Public Notice and its associated Drawings file (if any), click on the "Public Notice" or "Public Notice and Drawings" link and any additional links included in the attachments section. To download a file to your PC, right-click on the link, then select "Save Target As" from the menu. To view other Corps District's public notices click here,.

How to send comments. Comments can be mailed to the address appearing in the Public Notice or emailed to the Project Manager identified on the Public Notice. Comments made in reference to a Public Notice should include your name, address, and phone number as well as the permit application number identified on the Public Notice. 

Individuals or parties may request an extension of time in which to comment on the proposed work by writing to the project manager or clicking on the project manager’s name on the public notice grid on the web page.  Any request must be specific and substantively supportive of the requested extension, and received by this office prior to the end of the initial comment period.  The Branch Chief will review the request and the requestor will be promptly notified of the decision to grant or deny the request.  If granted, the time extension will be continuous to the initial comment period and, inclusive of the initial comment period, will not exceed a total of 30 calendar days.

To view issued or pending individual permits, click here.

Appeals of Jurisdictional Determinations and Proffered or Denied Permits. To view a table of administrative appeals within the Mississippi Valley Division, click here.

MVN-2008-1186-EPP

PN ALL
Published May 30, 2022
Expiration date: 6/18/2022

NAME OF APPLICANT: KV Enterprises, LLC, c/o Professional Engineering & Environmental Consultants, Inc., Attention: Mo Saleh, 1065 Muller Parkway, Suite B, Westwego, Louisiana 70094.

LOCATION OF WORK: Located at 5900 LA Highway 3127, in Killona, Louisiana, in St. Charles Parish, as shown on the attached drawings.

POB: Latitude: 30.00584    Longitude: -90.51464

Hydrologic Unit Codes: 08090301, East Central Louisiana Coastal

The work described below was partially completed prior to obtaining a Department of the Army permit and was in violation of Section 301 of the Clean Water Act. All legal issues concerning the unauthorized work have since been deferred.

CHARACTER OF WORK: Clear, grade, excavate and fill for the expansion of the existing Killona landfill; to include the installation of two (2) culverts. The project as proposed would directly impact approximately 32.9 acres of jurisdictional wetlands; of which approximately 8.31 acres had been cleared prior. The applicant proposed to contract with an approved mitigation bank to offset the adverse impact to jurisdictional wetlands.

The applicant may be required to restore the site fully or partially to pre-project conditions if issuance of a permit is determined to be contrary to the public interest.