9.0 SYSTEM M-CACES COST ESTIMATE SUMMARIES
Details of the project cost estimates are available in 20 volumes. The following sections summarize the project cost for each feature. The cost of environmental monitoring during project construction is estimated to be $1.6 million and is a project cost that is not shown in these tables.
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
9.1 Modified Highway 57 Alignment Cost Summary |
 |
 |
 |
 |
Project Feature |
 |
 |
 |
Feature Description |
 |
 |
 |
100-year level of protection |
 |
 |
 |
85-year level of protection |
 |
 |
 |
 |
 |
Floodgates |
 |
 |
 |
Bayou Du Large |
 |
 |
 |
12,906,000 |
 |
 |
 |
12,906,000 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
Bayou Grand Caillou |
 |
 |
 |
11,805,000 |
 |
 |
 |
11,805,000 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
Bayou Little Caillou |
 |
 |
 |
12,831,000 |
 |
 |
 |
12,831,000 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
Bayou Terrebonne |
 |
 |
 |
16,105,000 |
 |
 |
 |
16,105,000 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
Bush Canal |
 |
 |
 |
12,957,000 |
 |
 |
 |
12,957,000 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
Falgout Canal |
 |
 |
 |
13,303,000 |
 |
 |
 |
13,303,000 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
GIWW Floodgate at Bayou Lafourche |
 |
 |
 |
23,844,000 |
 |
 |
 |
23,844,000 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
GIWW Floodgate at Houma |
 |
 |
 |
42,100,000 |
 |
 |
 |
42,100,000 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
Grand Bayou |
 |
 |
 |
13,269,000 |
 |
 |
 |
13,269,000 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
Humble Canal |
 |
 |
 |
13,008,000 |
 |
 |
 |
13,008,000 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
Bayou Pointe au Chien |
 |
 |
 |
12,911,000 |
 |
 |
 |
12,911,000 |
 |
 |
 |
 |
 |
Locks |
 |
 |
 |
Houma Navigation Canal Lock |
 |
 |
 |
96,946,000 |
 |
 |
 |
96,946,000 |
 |
 |
 |
 |
 |
Levees |
 |
 |
 |
Earthen Levees |
 |
 |
 |
256,529,000 |
 |
 |
 |
218,905,000 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
Pipeline Relocations |
 |
 |
 |
43,164,000 |
 |
 |
 |
43,164,000 |
 |
 |
 |
 |
 |
Environmental Structures |
 |
 |
 |
Box Culverts |
 |
 |
 |
32,426,000 |
 |
 |
 |
32,426,000 |
 |
 |
 |
 |
 |
Roadway Crossings |
 |
 |
 |
Road Floodgates and Ramps |
 |
 |
 |
4,120,000 |
 |
 |
 |
4,120,000 |
 |
 |
 |
 |
 |
Pumping Stations |
 |
 |
 |
Fronting Protection |
 |
 |
 |
3,203,000 |
 |
 |
 |
3,203,000 |
 |
 |
 |
 |
 |
Total Hurricane Protection System |
 |
 |
 |
$621,427,000 |
 |
 |
 |
$583,803,000 |
 |
 |
 |
 |
 |
 |
9.2 Reconnaissance Alignment |
 |
 |
 |
 |
Project Feature |
 |
 |
 |
Feature Description |
 |
 |
 |
100-year level of protection |
 |
 |
 |
85-year level of protection |
 |
 |
 |
 |
 |
Floodgates |
 |
 |
 |
Bayou Petit Caillou |
 |
 |
 |
16,105,000 |
 |
 |
 |
16,105,000 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
Bayou Terrebonne |
 |
 |
 |
16,105,000 |
 |
 |
 |
16,105,000 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
GIWW Floodgate at Bayou Lafourche |
 |
 |
 |
23,844,000 |
 |
 |
 |
23,844,000 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
GIWW Floodgate at Houma |
 |
 |
 |
42,100,000 |
 |
 |
 |
42,100,000 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
Grand Bayou |
 |
 |
 |
13,269,000 |
 |
 |
 |
13,269,000 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
Houma Navigation Canal |
 |
 |
 |
51,544,000 |
 |
 |
 |
51,544,000 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
Humble Canal |
 |
 |
 |
13,008,000 |
 |
 |
 |
13,008,000 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
Bayou Pointe au Chien |
 |
 |
 |
12,911,000 |
 |
 |
 |
12,911,000 |
 |
 |
 |
 |
 |
Levees |
 |
 |
 |
Earthen Levees |
 |
 |
 |
172,129,000 |
 |
 |
 |
158,791,000 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
Pipeline Relocations |
 |
 |
 |
44,659,000 |
 |
 |
 |
44,659,000 |
 |
 |
 |
 |
 |
Environmental Structures |
 |
 |
 |
Box Culverts |
 |
 |
 |
14,551,000 |
 |
 |
 |
14,551,000 |
 |
 |
 |
 |
 |
Roadway Crossings |
 |
 |
 |
Road Floodgates and Ramps |
 |
 |
 |
3,874,000 |
 |
 |
 |
3,874,000 |
 |
 |
 |
 |
 |
Pumping Stations |
 |
 |
 |
Fronting Protection |
 |
 |
 |
5,960,000 |
 |
 |
 |
5,960,000 |
 |
 |
 |
 |
 |
Total Hurricane Protection System |
 |
 |
 |
$430,059,000 |
 |
 |
 |
$416,721,000 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |