Contractor: C.R. Pittman Construction Company Inc.
Description of work: The work consists of clearing and grubbing; channel, canal, borrow pit and structural excavation; levee construction; placing structural backfill, bedding and riprap; furnishing and driving prestressed concrete piles and steel sheet piling; placing reinforced concrete; installing precast concrete bridge deck units; installing staff gages; installing a 60 feet by 30 feet preengineered building; installing an aluminum sluice gate; furnishing and installing structural steel form suction intakes, trash racks and bulkheads; installing and removing a bypass road; utility installation; modifications and relocations; fertilizing and seeding; and furnishing and installing pumps, motors and appurtenant mechanical and electrical equipment.
Contractor: Maharrey-Houston Construction Company Inc.
Description of work: The work consists of the constructing a pile-supported culvert structure passing under the mainline Mississippi River levee and consisting of reinforced concrete box culverts with prefabricated cast iron sluice gates, structural steel bulkheads and hydraulic gate operators. Construction will also include a railroad and a two lane highway; earthen cofferdams; dewatering system; braced excavation of an inflow and outflow channel; clearing and grubbing; driving steel sheet piles. timber piles and prestressed concrete piles; fertilizing and seeding; electrical work; constructing outflow guide levees, stone slope and channel protection; rebuilding the main line Mississippi River levee.
Contractor: River Road Construction Inc.
Description of work: The work consists excavating a small segment of the Davis Pond Diversion Structure Outfall Channel (approximately 1,500 feet) and constructing a simple span concrete bridge at the existing U.S. Highway 90 roadbed (354 feet long with six spans). The work includes constructing and removing a detour road and preloading a portion of the new approach ramps. The bridge construction includes testing and installing precast, prestressed, concrete piles; channel excavation and riprap placement; fabricating and installing Type III precast, prestressed concrete girders; constructing cast-in-place abutments, T-walls, bridge deck, and barrier walls. Roadwork includes placing an embankment and asphalt and concrete approach slabs; installing roadway appurtenances; and drainage work.
Contractor: Weeks Marine Inc.
Description of work: The work consists of clearing and grubbing, closing five canals, including a geotextile separator blanket and shell plug, placing uncompacted embankment, fertilizing and seeding and constructing a weir by placing a gabion mattress on a geotextile blanket.
Contractor: J. Caldarera and Company Inc.
Description of work: The work consists of clearing and grubbing, closing pipelines, degrading an existing ridge, placing uncompacted levee embankment, fertilizing and seeding, constructing a ramp crossing and constructing a drainage system consisting of culverts, sluice gates and flap gates.
Contractor: Souter Construction Company
Description of work: The work consists of clearing and grubbing; constructing a double track detour for the railroad; constructing storm drainage improvements; performing pile load tests and driving precast, prestressed concrete piles; fabricating and installing precast, prestressed girders; placing reinforced concrete for bridge deck, and abutments; excavating a segment of the outflow channel and placing stone riprap under the bridge; constructing guide levees for outflow channel; removing railroad detour when bridge is complete; and fertilizing and seeding levees and work area. As of October 1998
|