| Hurricane & Storm Damage Risk Reduction |
|
Existing Pump Station Repair Area Wide (July 2008)
Work Description
- Repair existing pump stations
- Install storm proofing measures at existing pump stations
- Install SCADA system for ICS temporary pumps
- Install generator at PS#6
- Install temporary pumps
|
| |
Repairs |
| Projects |
30 |
| Complete |
18 |
| In Construction |
8 |
| In Design |
4 |
| Prepping for P & S |
0 |
|