| Channel Improvement and Stabilization Program |
|
Miscellaneous Information
- Revetment Repair Procedures:
Standard procedures when penetrating revetments with piles,
caissons and/or pile clusters.
- Discharge/Intake Pipeline Permit Requirements:
General requirements for discharge/intake pipeline permits as they relate to bank stability.
Stone Specifications:
Stone specifications used in the annual Flood Control, Mississippi
River and Tributaries, Stone Placement, Mississippi, Atchafalaya and
Red Rivers, and Old River Control Channels Contract. Specifications
give the rate of application, description, gradation, and size of stone
used for bank stabilization work on the Mississippi River.
Latitude and Longitude Revetment Tables:
Tables of baseline and upper bank latitude and longitude coordinates which can be used to
locate revetment ranges in the field.
Contact
Don Rawson, CEMVN-ED-LC
504-862-2952
Donald.E.Rawson@usace.army.mil
Updated 8/29/2011
|
|