July 24, 2002
Levee and Existing Drainage Canal on Pump Station |
July 24, 2002
Existing Drainage Canal and Culvert on Pump Station |
July 24, 2002
Clearing Operation |
July 24, 2002
Clearing and Disking Operation |
July 24, 2002
Specialized Off Road Dump Trucks for hauling Muck Material from Drainage Canal |
July 24, 2002
Excavator Removing Debris From Canal |
July 24, 2002
Existing Levee Looking Toward the Flood Site |
July 24, 2002
Alligator Hiding on Toe of Levee on Flood Site |
July 24, 2002
Alligator Hissing at Onlookers |
August 9, 2002
Sand backfill in existing drainage ditch |
August 9, 2002
Sand backfill in existing drainage ditch |
August 9, 2002
Demuck existing drainage ditch |
November 14, 2002
Excavating new drainage ditch, inside slope incomplete
|

November 14, 2002
Active Oil Drilling Rig Next to Todd Levee
|

November 14, 2002
Sand Backfill in Existing Drainage Ditch
|
November 14, 2002
Sand Backfill in Existing Drainage Ditch |
November 14, 2002
Sand Backfill in Existing Drainage Ditch
|
January 24, 2003
Area of New Pumping Station Location
|
January 24, 2003
New Drainage Ditch |
January 24, 2003
New Drainage Ditch |

January 24, 2003
New Drainage Ditch & Levee Construction |
January 24, 2003
New Drainage Ditch & Levee Construction
|
January 24, 2003
New Drainage Ditch & Levee Construction |

April 23, 2003
Concrete placement in the walls of the structure.
|

April 23, 2003
Workers vibrating concrete placed in walls of structure. |

April 23, 2003
Workers placing concrete in walls of structure.
|

April 23, 2003
Vibrating concrete after placement.
|

April 23, 2003
Concrete truck preparing to fill 2cy concrete bucket.
|

April 23, 2003
Worker vibrating concrete in walls of structure.
|
|
|
|