April 4, 2002
Access Road to Job site
|
April 4, 2002
Pipeline Bridge Crossing
|
April 4, 2002
Pipeline Bridges
|
April 4, 2002
Pipeline Bridges
|
|
April 4, 2002
Placement of Surfacing Material on Access Road
|
April 4, 2002
Levee Crown Prior to Driving Sheet Piles
|
April 4, 2002
Surfacing Material
|
April 4, 2002
Crown of Levee
|
|
July 24, 2002
Start of Sheet Pile Wall Tie-In to Existing Levee
|
July 24, 2002
Sheet Pile Floodwall
|
July 24, 2002
Close Up View of Sheet Pile
|
July 24, 2002
Sheet Pipe at Upper End of Job
|
|
Aug 7, 2002
5299 American Crane and template used to drive AZ13 steel sheet piles
|
Aug 7, 2002
Relocation of active Promix 4” petroleum Pipe Line at station 242+50
|
Aug 7, 2002
Promix Petroleum Pipe Line
|
Aug 7, 2002
Pipe Line sleeve welded to the steel sheet pile
|
|
Aug 7, 2002
Vibratory Hammer (ICE model no. 1123) used to drive steel sheet
piles
|
August 16, 2002
Foot Marks where Black Bear Jumps onto and Leaps Over Sheet Pile Floodwall
|
August 16, 2002
Black Bear Foot Marks on Sheet Pile Floodwall
|
August 16, 2002
Black Bear Foot Marks on Sheet Pile Floodwall
|
|
August 16, 2002
Balck Bear's Foot Print in the soil next to Floodwall
|