Public Notices Overview

ALL projects are sorted by issuance date. The public notices and drawings are in PDF formatted files. You must have Adobe Acrobat Reader installed on your PC to view the files. If you don't have it, you may download it free from www.adobe.com.  

Instant Notification of New Public Notices:  Click on the green RSS button to the right to receive automatic e-mail updates. If you wish to subscribe you need an RSS app installed on your device. Please note that all web browsers do not support RSS feeds.

Viewing Notices. To view a Public Notice and its associated Drawings file (if any), click on the "Public Notice" or "Public Notice and Drawings" link and any additional links included in the attachments section. To download a file to your PC, right-click on the link, then select "Save Target As" from the menu. To view other Corps District's public notices click here,.

How to send comments. Comments can be mailed to the address appearing in the Public Notice or emailed to the Project Manager identified on the Public Notice. Comments made in reference to a Public Notice should include your name, address, and phone number as well as the permit application number identified on the Public Notice. 

Individuals or parties may request an extension of time in which to comment on the proposed work by writing to the project manager or clicking on the project manager’s name on the public notice grid on the web page.  Any request must be specific and substantively supportive of the requested extension, and received by this office prior to the end of the initial comment period.  The Branch Chief will review the request and the requestor will be promptly notified of the decision to grant or deny the request.  If granted, the time extension will be continuous to the initial comment period and, inclusive of the initial comment period, will not exceed a total of 30 calendar days.

To view issued or pending individual permits, click here.

Appeals of Jurisdictional Determinations and Proffered or Denied Permits. To view a table of administrative appeals within the Mississippi Valley Division, click here.

MVN-2022-00179-CF

CEMVN-RG
Published April 25, 2022
Expiration date: 5/14/2022

NAME OF APPLICANT:  TOWER CAPITAL c/o Michael Henry, Hydrik, 2323 Hwy 190 E, Suite 2, Hammond, LA 70401

LOCATION OF WORK:  Along Hooper Road, Latitude 30.530254, Longitude -91.101037, Baton Rouge, Louisiana, in East Baton Rouge Parish, within the Lake Pontchartrain Basin in hydrologic unit (HUC 08070202), as shown on the attached drawings. 

CHARACTER OF WORK:  The applicant has requested a Department of the Army authorization to clear, grade, excavate and deposit fill and/or aggregate material to construct and maintain a single-family residential development (Belle Arbor) to single- family residential lots, roadways, detention ponds, utilities, and drainage infrastructure.  Approximately 338,028 cubic yards of silt material will be excavated to construct the detention ponds and used for fill on site. The proposed project is situated on an approximately 53.70-acre tract that has been determined to contain a mixture of pasture and forested wetlands and non-wetland waters. Nearly the entire tract will be utilized to construct the residential development. The proposed project is expected to impact 6.84 acres of wetlands and the applicant is proposing to avoid 0.85 acre of wetlands. It is anticipated that the proposed action would have minimal impact on adjacent wetlands with the use of best management practices to reduce runoff and erosion.

The applicant claims that potential minimization will be addressed post notice and mitigation will be purchased at an approved bank within the Pontchartrain Basin.