|
Solicitation Number
|
Title
|
Location
|
Issue Date
|
Closing Date
|
| Architect / Engineer |
|
W912P807D0054001101
|
RECOVERY Larose to Golden Meadow
|
GIWW
|
10/29/2009
|
11/28/2009 2:00PM
|
|
W912P8-09-D-0007-11
|
RECOVERY Periodic Inspection of Levee Systems Morganza Floodway
|
Morganza Floodway
|
11/19/2009
|
12/19/2009 2:00P.M.
|
|
W912P8-08-R-0074
|
A-E INDEFINITE DELIVERY, INDEFINITE QUANTITY(IDIQ) CONTRACT(S), GENERAL DESIGN SUPPORT SERVICES PRIMARILY WITHIN THE LIMITS OF THE NEW ORLEANS DISTRICT
|
NEW ORLEANS, LA
|
Under Evaluation
|
| Construction |
LPV6C2-10-S-0001
l
Am:0001 11/17/2009
|
Goodhope Floowall Phase 2 LPV6C2 ED 09-018
|
St. Charles Parish, LA
|
11/16/2009
|
12/1/2009 2:00 P.M.
|
W912P8-09-R-0078
l
Am:0006 11/19/2009
|
SELA-19, Southeast Louisiana Urban Flood Control Project, Widening of Florida Avenue Canal, Mazant Street to Suction Inlet of Drainage Pumping Station No. 19, Orleans Parish, LA, ED 09-177
|
Orleans Parish, LA
|
10/8/2009
|
11/25/2009 2:00 PM
|
|
W912P8-09-R-0106
|
WBV-15a.2 Westbank and Vicinity, New Orleans, Louisiana, Hurricane Protection Project, Lake Cataouatche Levee Enlargement, Lake Cataouatche Pump Station to Segnette State Park, Phase 2, First Lift, (ED 08-061)
|
Jefferson Parish, Louisiana
|
11/17/2009
|
1/4/2010 2:00 pm
|
W912P8-09-R-0116
l
Am:0001 11/3/2009
|
West Bank and Vicinity, New Orleans, LA, Hurricane Protection Project Westwego to Harvey Canal, WBV16.2, Bayou Segnette Complex
|
Jefferson Parish, LA
|
10/21/2009
|
12/2/2009 2:00 p.m.
|
W912P8-09-R-0133
Advanced Notice
|
West Bank and Vicinity, New Orleans, LA, Hurricane Protection Project, WBV-14i: V-Line Levee, Louisiana Highway 3134 Highway Crossing
|
Jefferson Parish, LA
|
12/2/2009
|
1/2/2010 2:00pm
|
W912P8-10-R-0001
l
Am:0001 11/18/2009
|
WBV-11 - West Bank and Vicinity, New Orleans, Louisiana, Hurricane Protection Project, East and West of Algiers Canal, WBV-11, Belle Chasse No. 2 Pump Station (ED 06-066)
|
Plaquemines Parish, LA
|
10/30/2009
|
11/30/2009 2:00 p.m.
|
W912P8-10-R-0002
l
Am:0002 11/20/2009
|
LPV06e.2 Lake Pontchartrain and Vicinity, Hurricane Protection Project, North of Airline Hwy
|
St. Charles Parish, LA
|
10/30/2009
|
12/3/2009 2:00 p.m.
|
W912P8-10-R-0005
Advanced Notice
|
WBV-46.2, West Bank and Vicinity, New Orleans, Louisiana, Hurricane Protection Project, WBV-46.2 Cousins Canal Floodwalls - Destrehan Bridge to Sector Gate (ED 09-028)
|
Jefferson Parish, Louisiana
|
12/18/2009
|
1/19/2010 2:00 p.m.
|
W912P8-10-R-0006
Advanced Notice
|
HPO - Hurricane Protection Project - LPV 144, Lake Pontchartrain and Vicinity, Bayou Dupre Sector Gate
|
St. Bernard Parish, Louisiana
|
11/30/2009
|
12/30/2009 2:00 P.M.
|
W912P8-10-R-0011
Advanced Notice
|
LPV 3.2b, Hurricane Protection Project, West Return Floodwall (North Segment)
|
Jefferon and St. Charles Parish, LA
|
12/3/2009
|
1/5/2010 2:00 PM
|
LP1031-09-H-0002
l
Am:0005 7/21/2009
|
HPO HUBZone MATOC Reach LPV 103, Phase 1A1 Hurricane Protection System, East Bank Orleans Outfall Canal to West Bank London Avenue Outfall Canal, Lake Pontchartrain and Vicinity, Orleans Parish Louisiana
|
Orleans Parish, Louisiana
|
Under Evaluation
|
W912P8-07-R-0021
l
Am:0001 11/27/2006
|
HPO- Pump Bearing Procurement and Replacement Stations 4, 6, 10, 12 and 19, HPO-OPS-06B
|
Orleans Parish, LA
|
Under Evaluation
|
|
W912P8-09-R-0031
|
Levee Improvements to the Chalmette Loop Levee, Bayou Dupre to Hwy 46, Reach LPV 146, in St. Bernard Parish, LA.
|
St. Bernard Parish, LA
|
Under Evaluation
|
|
W912P8-09-R-0031
|
Levee Improvements to the Chalmette Loop Levee, Bayou Dupre to Hwy 46, Reach LPV 146, in St. Bernard Parish, LA.
|
St. Bernard Parish, LA
|
Under Evaluation
|
|
W912P8-09-R-0032
|
Levee Improvements to the Chalmette Loop Levee - Highw ay 46 and Bayou Road Floodgate (Verret to Caernarvon) Floodwall and Structures, in St. Bernard Parish, LA
|
St. Bernard Parish, LA
|
Under Evaluation
|
|
W912P8-09-R-0063
|
Lake Pontchartrain and Vicinity Project to Protect the Inner Harbor Navigation Canal (IHNC) Seabrook Gate Complex Orleans Parish
|
Orleans Parish
|
Under Evaluation
|
W912P8-08-B-0032
l
Am:0001 4/23/2009
|
Mississippi River, New Orleans Harbor Cutterhead Dredge Rental No. 2-2008
|
Orleans and Jefferson Parishes, Louisiana
|
2/11/2008
|
2/11/2010 11:00 AM
|
W912P8-08-B-0033
l
Am:0001 4/22/2009
|
Mississippi River, New Orleans Harbor Cutterhead Dredge Rental No. 3-2008
|
Orleans and Jefferson Parishes, Louisiana
|
2/11/2008
|
2/11/2010 11:00 AM
|
W912P8-08-B-0067
l
Am:0001 4/4/2009
|
MVN – Mississippi River, Cubit’s Gap and Southwest Pass, Hopper Dredge Rental Contract No. 18-2008 (OM-08-018)
|
Plaquemines Parish, Louisiana
|
9/17/2008
|
10/10/2010 11:00am
|
W912P8-08-B-0068
l
Am:0001 3/26/2009
|
MVN- Mississippi River, Cubit's Gap and Southwest Pass, Hopper Dredge Rental Contract No. 19-2008 (OM-08-019)
|
Plaquemines Parish, Louisiana
|
9/17/2008
|
10/10/2010 11:00 a.m.
|
W912P8-08-B-0070
l
Am:0001 3/20/2009
|
Contract No. 21-2008, Mississippi River, Cubit’s Gap and Southwest Pass, Hopper Dredge Rental
|
Plaquemines Parish, Louisiana
|
9/24/2008
|
10/18/2011 11:00 am
|
W912P8-08-B-0072
l
Am:0001 4/22/2009
|
Mississippi River, Cubit’s Gap and Southwest Pass, Hopper Dredge Rental Contract No. 23-2008
|
Plaquemines Parish, Louisiana
|
9/24/2008
|
10/18/2011 11:00 am
|
W912P8-09-B-0004
l
Am:0001 3/20/2009
|
MVN - Mississippi River, Cubit's Gap and Southwest Pass, Hopper Dredge Rental Contract No. 4-2009 (OM-09-004)
|
Plaquemines Parish, LA
|
10/21/2008
|
2/12/2010 11:00 am
|
|
W912P8-09-B-0030
|
Atchafalaya Basin, Gulf Intercoastal Waterway (GIWW) and Miscellaneous Projects, Cutterhead Dredge Rental No. 4-2009
|
|
1/22/2009
|
3/23/2010 12:00
|
|
W912P8-09-B-0046
|
Passes of the Mississippi River, Southwest Pass Maintenance Dredging, Cutterhead or Dustpan Rental No. 2-2009, Mile 5.0 AHP to 19.5 BHP, C/L Sta. 2925+20 to C/L Sta. 1094+00 (Non-Continuous)
|
Plaquemines Parish, Louisiana
|
3/31/2009
|
3/31/2012 11:00 AM
|
|
W912P8-09-B-0078
|
Mississippi River Outlet Vicinity of Vience, La., Tiger Pass, Maintenance Dredging , Approx. Miles 7.3 to 14.0 Plaquemines Parish, La.
|
Venice, Louisiana
|
9/11/2009
|
10/13/2011 11:00 AM
|
|
W912P8-09-B-0079
|
Mississippi River Outlets Vicinity of Venice, La. Tiger Pass, Maintenance Dredging, Approximatley Miles 7.3 to 14.0 Plaquemines Parish, La.
|
Venice, Louisana
|
9/11/2009
|
10/13/2011 11:00 AM
|
W912P8-09-B-0083
l
Am:0001 11/9/2009
|
LPV-07c.2, St. Rose Drainage Structure & Levee
|
St. Charles Parish
|
11/3/2009
|
12/3/2009 02:00 PM
|
W912P8-09-B-0085
l
Am:0001 11/4/2009
|
Barataria Bay Waterway Maintenance Dredging
|
Bayou Rigaud, Jefferson Parish, LA
|
10/30/2009
|
12/1/2009 2:00 P.M.
|
|
W912P8-10-B-0001
|
MVN - Mississippi River, Cubit's Gap and Southwest Pass, Hopper Dredge Rental Contract No. 1-2010 (OM-10-001)
|
Plaquemines Parish, LA
|
10/15/2009
|
11/2/2012 11:00 a.m.
|
|
W912P8-10-B-0002
|
MVN – Mississippi River, Cubit’s Gap and Southwest Pass, Hopper Dredge Rental Contract No. 2-2010, Plaquemines Parish, Louisiana (OM-10-002)
|
Plaquemines Parish, LA
|
10/15/2009
|
11/2/2012 11:00 A.M.
|
|
W912P8-10-B-0003
|
Mississippi River, Cubit's Gap and Southwest Pass, Hopper Dredge Rental Contract No. 3-2010
|
Plaquemines Parish, LA
|
10/15/2009
|
11/2/2012 11:00 a.m.
|
|
W912P8-10-B-0004
|
MVN - Mississippi River, Cubit's Gap and Southwest Pass, Hopper Dredge Rental Contract No. 4-2010, Plaquemines Parish, Louisiana (OM-10-004)
|
Plaquemines Parish, Louisiana
|
10/15/2009
|
11/2/2012 11:00AM
|
|
W912P8-10-B-0005
|
MVN – Mississippi River, Cubit’s Gap and Southwest Pass, Hopper Dredge Rental Contract No. 5-2010, Plaquemines Parish, Louisiana (OM-10-005)
|
Plaquemines Parish, Louis
|
10/15/2009
|
11/2/2012 11:00am
|
|
W912P8-10-B-0006
|
Mississippi River, Cubit’s Gap and Southwest Pass, Hopper Dredge Rental Contract No. 6-2010,(OM-10-06)
|
Plaquemines Parish, Louisiana
|
10/15/2009
|
11/2/2012 11:00 A.M.
|
|
W912P8-10-B-0007
|
Mississippi River, Cubit's Gap and Southwest Pass, Hopper Dredge Rental Contract No. 07-2010, Plaquemines Parish, La. (OM 10-007)
|
Plaquemines Parish, Louisiana
|
10/15/2009
|
11/2/2012 11:00 AM
|
|
W912P8-10-B-0008
|
MVN - Mississippi River, Cubit's Gap and Southwest Pass, Hopper Dredge Rental Contract No. 8-2010, (OM-10-008)
|
Plaquemines Parish, Louisiana
|
10/15/2009
|
11/2/2012 11:00 a.m
|
|
W912P8-10-B-0009
|
MVN – Mississippi River, Cubit’s Gap and Southwest Pass, Hopper Dredge Rental Contract No. 9-2010, Plaquemines Parish, Louisiana (OM-10-009)
|
Plaquemines Parish, LA
|
10/15/2009
|
11/2/2012 11:00 A.M.
|
|
W912P8-10-B-0010
|
Mississippi River, Cubit's Gap and Southwest Pass, Hopper Dredge Rental Contract No. 10-2010
|
Plaquemines Parish, LA
|
10/15/2009
|
11/2/2012 11:00 a.m.
|
|
W912P8-10-B-0011
|
MVN – Mississippi River, Cubit’s Gap and Southwest Pass, Hopper Dredge Rental Contract No. 11-2010, Plaquemines Parish, Louisiana (OM-10-011)
|
Plaquemines Parish, LA
|
10/15/2009
|
11/2/2012 11:00 AM
|
|
W912P8-10-B-0012
|
MVN – Mississippi River, Cubit’s Gap and Southwest Pass, Hopper Dredge Rental Contract No. 12-2010, Plaquemines Parish, Louisiana (OM-10-012)
|
Plaquemines Parish, LA
|
10/15/2009
|
11/2/2012 11:00am
|
|
W912P8-10-B-0013
|
Mississippi River, Cubit’s Gap and Southwest Pass, Hopper Dredge Rental Contract No. 13-2010, (OM-10-13)
|
Plaquemines Parish, Louisiana
|
10/15/2009
|
11/2/2012 11:00 a.m.
|
|
W912P8-10-B-0014
|
Mississippi River, Cubits Gap and Southwest Pass, Hopper Dredge Rental Contract No. 14-2010, Plaquemines , La. (OM 10-014)
|
Plaquemines Parish, Louisiana
|
10/15/2009
|
11/12/2012 11:00 AM
|
|
W912P8-10-B-0015
|
MVN – Mississippi River, Cubit’s Gap and Southwest Pass, Hopper Dredge Rental Contract No. 15-2010, (OM-10-015)
|
Plaquemines Parish, Louisiana
|
10/15/2009
|
11/2/2012 11:00 A.M.
|
|
W912P8-10-B-0017
|
PRO - WBV-24 Segnette State Park Floodwall
|
Jefferson Parish, Louisiana
|
10/28/2009
|
12/1/2009 2:00 PM
|
|
W912P8-10-B-0020
|
Cross Bayou Drainage Structure - Phase 2 (ED 09-045)
|
Charles Parish, LA
|
11/17/2009
|
12/17/2009 2:00 pm
|
W912P8-10-B-0021
Advanced Notice
|
MVN - Port Fourchon Navigation Channel Maintenance Dredging #10-1, C/L Sta. 200+00 to C/L Sta. 330+00 (ED 10-026)
|
Lafourche Parish, Louisiana
|
12/7/2009
|
1/6/2012 11:00 a.m.
|
W912P8-10-B-0023
l
Am:0002 11/19/2009
|
Atchafalaya Basin Protection Levee, E-40 Levee Enlargement, 2nd Lift, B/L STATION 2010+00 to B/L STATION 2200+00
|
Iberville Parish, LA
|
11/12/2009
|
12/15/2009 11:00am
|
|
W912P8-10-B-0024
|
Calcasieu River & Pass, 2010 Maintenance Dredging, Bar Channel
|
Cameron Parish, LA
|
11/10/2009
|
1/20/2012 2:00 PM CST
|
|
W912P8-10-B-0025
|
MVN – Calcasieu River & Pass, 2010 Maintenance Dredging, Bar Channel Hopper Dredge Rental Contract No. 2-2010, Cameron Parish, LA (OM-10-126)
|
CAMERON PARISH, LA
|
11/5/2009
|
1/1/2012 2:00 PM CST
|
|
W912P8-10-B-0026
|
Calcasieu River & Pass, 2010 Maintenance Dredging, Bar Channel Hopper Dredge Rental Contract No. 3-2010, Cameron Parish, LA (OM-10-127)
|
Cameron Parish, LA
|
11/9/2009
|
11/19/2011 2:00 PM
|
|
W912P8-10-B-0027
|
– Calcasieu River & Pass, 2010 Maintenance Dredging, Bar Channel Hopper Dredge Rental Contract No. 4-2010, Cameron Parish, LA (OM-10-128)
|
Cameron Parish, LA
|
11/5/2009
|
1/1/2012 02:00 PM CST
|
|
W912P8-10-B-0028
|
MVN – Calcasieu River & Pass, 2010 Maintenance Dredging, Bar Channel Hopper Dredge Rental Contract No. 5-2010, Cameron Parish, LA (OM-10-129)
|
Cameron Parish, LA
|
11/6/2009
|
1/1/2012 2:00p.m.
|
|
W912P8-10-B-0028
|
MVN – Calcasieu River & Pass, 2010 Maintenance Dredging, Bar Channel Hopper Dredge Rental Contract No. 5-2010, Cameron Parish, LA (OM-10-129)
|
Cameron Parish, LA
|
11/6/2009
|
1/1/2012 2:00p.m.
|
|
W912P8-10-B-0028
|
MVN – Calcasieu River & Pass, 2010 Maintenance Dredging, Bar Channel Hopper Dredge Rental Contract No. 5-2010, Cameron Parish, LA (OM-10-129)
|
Cameron Parish, LA
|
11/6/2009
|
1/1/2012 2:00p.m.
|
|
W912P8-10-B-0028
|
MVN – Calcasieu River & Pass, 2010 Maintenance Dredging, Bar Channel Hopper Dredge Rental Contract No. 5-2010, Cameron Parish, LA (OM-10-129)
|
Cameron Parish, LA
|
11/6/2009
|
1/1/2012 2:00p.m.
|
W912P8-10-B-0029
Advanced Notice
|
HPO, LPV 104.02, Lake Pontchartrain and Vicinity, New Orleans, LA, Hurricane Protection Project, Floodwall Replacement, Floodwall Construction, London Ave. Canal to IHNC
|
New Orleans Metro, LA
|
11/23/2009
|
12/23/2009 2:00 p.m.
|
W912P8-10-B-0032
l
Am:0001 11/20/2009
|
MVN - Mississippi River, New Orleans Harbor Cutterhead Dredge Rental 1-2010 (OM-10-030)
|
Orleans and Jefferson Parishes, Louisiana
|
11/17/2009
|
12/16/2011 11:00 a.m.
|
W912P8-10-B-0033
l
Am:0001 11/20/2009
|
Mississippi River, New Orleans Harbor Cutterhead Dredge Rental No. 2-2010 (OM-10-031)
|
Orleans and Jefferson Parishes, Louisiana
|
11/17/2009
|
1/1/2012 10:00 a.m.
|
W912P8-10-B-0034
l
Am:0001 11/20/2009
|
MVN - Mississippi River, New Orleans Harbor Cutterhead Dredge Rental No. 3-2010 (OM-10-032)
|
Orleans and Jefferson Parishes, Louisiana
|
11/17/2009
|
12/16/2011 11:00 a.m.
|
|
W912P8-10-B-0042
|
HPO, LPV 109.02a, New Orleans East Levee South Point to CSX Railroad
|
Orleans Parish, LA
|
11/20/2009
|
12/20/2009 2:00 P.M.
|
W912P8-10-B-0043
Advanced Notice
|
HPO, LPV 105.01, Lake Pontchartrain and Vicinity, New Orleans, LA, Hurricane Protection Project, Floodwall Replacement, Floodwall Construction, along Haynes Blvd from Jourdan Road to Downman Road
|
Orleans Parish, LA
|
12/2/2009
|
1/2/2010 2:00 P.M.
|
|
W912P9-10-B-0201
|
Non Federal Levee Restoration Mitigation Contract
|
Terrebonne Parish, LA
|
11/10/2009
|
12/10/2009 Noon
|
WB15A2-09-H-0038
Advanced Notice
|
WBV-15a.2, Westbank and Vicinity, New Orleans, Louisiana, Hurricane Protection Project, Lake Cataouatch Levee Enlargement, Lake Cataouatche Pump Station to Segnette State Park, Phase 2, First Lifft,. (ED 08-061)
|
Jefferson Parish, Louisiana
|
12/3/2009
|
1/4/2010 2:00 p.m.
|
|
W912P8-06-B-0034
|
UNRESTRICTED BARATARIA BAY WATERWAY, MAINTENANCE DREDGING BAR CHANNEL, JEFFERSON PARISH, LA
|
JEFFERSON PARISH, LA
|
8/1/2006
|
TBD
|
|
W912P8-07-B-0042
|
Gulf Intercoastal Waterway, Port Allen to Morgan City Alternate Route, Maintenance Dredging, C/L Sta. 4+00 to C/L Sta. 158+00 , Non-Continuous
|
Iberville Parish, Louisiana
|
8/14/2007
|
TBD
|
|
W912P8-08-B-0018
|
Port Fourchon Navigation Channel Maintenance Dredging, C/L Sta. 200+00 to C/L Sta. 330+00
|
Lafourche Parish, LA
|
12/10/2007
|
TBD
|
|
W912P8-08-B-0024
|
Atchafalaya Basin, Gulf Intracoastal Waterway (GIWW) and Miscellaneous Projects, Cutterhead Dredge Rental No. 3-2008
|
See synopsis, description and magnitude of work.
|
11/30/2007
|
TBD
|
|
W912P8-08-B-0025
|
Atchafalaya Basin, Gulf Intracoastal Waterway (GIWW) and Miscellaneous Projects, Cutterhead Dredge Rental No. 4-2008
|
See synopsis and description and magnitude of work
|
11/30/2007
|
TBD
|
|
W912P8-08-B-0043
|
Mississippi River, Southwest Pass Maintenance Dredging, Cutterhead or Dustpan Dredge Rental No. 3-2008, Mile 5.0 AHP To Mile 19.5 BHP, C/L Sta. 2925+20 To C/L Sta 1094+00 (Non-Continuous), Plaquemines Parish, Louisiana OM-08-277
|
Plaquemines Parish, Louisiana
|
4/24/2008
|
TBD
|
W912P8-08-B-0048
l
Am:0001 12/17/2008
|
Atchafalaya Bay Channel, Maintenance Dredging, C/L Station 4355+59 to C/L Station 475+00
|
St. Mary Parish, LA
|
11/17/2008
|
TBD
|
W912P8-08-B-0052
l
Am:0001 7/27/2009
|
MVN – Mississippi River, Baton Rouge to Gulf of Mexico, Louisiana, FY-2008, Cutterhead Dredge Rental, Saltwater Barrier Sill, Plaquemines Parish, Louisiana (OM-08-130)
|
Plaquemines Parish, Louisiana
|
7/24/2008
|
TBD
|
W912P8-08-B-0053
l
Am:0001 8/22/2008
|
MVN - Various Bar Channels, Cutterhead Dredge Rental Contract No. 1-2008 (OM-08-500)
|
|
7/28/2008
|
TBD
|
|
W912P8-08-B-0054
|
MVN - Various Bar Channels, Cutterhead Dredge Rental Contract No. 2-2008 (OM-08-501)
|
|
7/28/2008
|
TBD
|
|
W912P8-08-B-0055
|
MVN – Various Bar Channels, Cutterhead Dredge Rental Contract No. 3-2008 (OM-08-502)
|
|
7/28/2008
|
TBD
|
|
W912P8-08-B-0064
|
Houma Navigation Canal, Terrebonne Bay and Cat Island Pass, Maintenance Dredging, C/L Sta. 1420+00 to C/L Sta. 2160+00 Non Continuous
|
Terrebonne Parish, LA
|
10/21/2008
|
TBD
|
|
W912P8-08-B-0065
|
MVN – Mississippi River, Cubit’s Gap and Southwest Pass, Hopper Dredge Rental Contract No. 16-2008
|
Plaquemines Parish, Louisiana
|
9/17/2008
|
TBD
|
|
W912P8-08-B-0066
|
MVN – Mississippi River, Cubit’s Gap and Southwest Pass, Hopper Dredge Rental Contract No. 17-2008
|
Plaquemines Parish, Louisiana
|
9/17/2008
|
TBD
|
|
W912P8-08-B-0069
|
MVN – Mississippi River, Cubit’s Gap and Southwest Pass, Hopper Dredge Rental Contract No. 20-2008
|
Plaquemines Parish, Louisiana
|
9/17/2008
|
TBD
|
W912P8-08-B-0071
l
Am:0001 4/6/2009
|
Mississippi River, Cubit’s Gap and Southwest Pass, Hopper Dredge Rental Contract No. 22-2008
|
Plaquemines Parish, Louisiana
|
9/24/2008
|
TBD
|
W912P8-08-B-0073
l
Am:0001 3/19/2009
|
Mississippi River, Cubit’s Gap and Southwest Pass, Hopper Dredge Rental Contract No. 24-2008
|
Plaquemines Parish, Louisiana
|
9/24/2008
|
TBD
|
|
W912P8-08-B-0074
|
Mississippi River, Cubit’s Gap and Southwest Pass, Hopper Dredge Rental Contract No. 25-2008
|
Plaquemines Parish, Louisiana
|
9/24/2008
|
TBD
|
|
W912P8-09-B-0012
|
MVN-Mississippi River, Cubit's Gap and Southwest Pass, Hopper Dredge Rental Contract No. 12-2009 (OM-09-012)
|
Plaquemines Parish, LA
|
10/21/2008
|
TBD
|
|
W912P8-09-B-0013
|
Mississippi River, Cubit’s Gap and Southwest Pass, Hopper Dredge Rental Contract No. 13-2009
|
Plaquemines Parish, Louisiana
|
10/21/2008
|
TBD
|
|
W912P8-09-B-0014
|
Mississippi River, Cubit’s Gap and Southwest Pass, Hopper Dredge Rental Contract No. 14-2009
|
Plaquemines Parish, Louisiana
|
10/21/2008
|
TBD
|
|
W912P8-09-B-0015
|
MVN- Mississippi River, Cubit's Gap and Southwest Pass, Hopper Dredge Rental Contract No. 15-2009 (OM-09-015)
|
Plaquemines Parish, LA
|
10/21/2008
|
TBD
|
W912P8-09-B-0019
l
Am:0001 8/8/2009
|
Atchafalaya River Bay, Bar, Horseshoe Cutterhead Dredge Rental No 2-2009, 0M-09-062
|
St. Mary and Terrebonne Parishes, LA
|
11/17/2008
|
TBD
|
W912P8-09-B-0020
l
Am:0001 12/11/2008
|
Atchafalaya River Bay, Bar, Horseshoe Cutterhead Dredge Rental No. 3-2009, OM-09-063
|
St. Mary and Terrebonne Parishes, Louisiana
|
11/26/2008
|
TBD
|
|
W912P8-09-B-0021
|
Atchafalaya River Bay, Bar, Horseshoe and Miscellaneous Projects, Cutterhead Rental Dredge No. 4-2009, OM-09-064
|
St. Mary and Terrebonne Parishes, LA
|
11/17/2008
|
TBD
|
|
W912P8-09-B-0023
|
MVN – Mississippi River, New Orleans Harbor Cutterhead Dredge Rental Nos. 2-2009.
|
Orleans and Jefferson Parish, Louisiana
|
11/21/2008
|
TBD
|
|
W912P8-09-B-0024
|
MVN – Mississippi River, New Orleans Harbor Cutterhead Dredge Rental Nos. 3-2009
|
Orleans and Jefferson Parish, Louisiana.
|
11/21/2008
|
TBD
|
|
W912P8-09-B-0025
|
MVN –Calcasieu River and Pass, 2009 Maintenance Dredging Bar Channel Hopper Dredge Rental Contract No. 1-2009, Cameron Parish, Louisiana, Specification
|
CAMERON PARISH, LA
|
11/25/2008
|
TBD
|
|
W912P8-09-B-0026
|
MVN –Calcasieu River and Pass, 2009 Maintenance Dredging Bar Channel Hopper Dredge Rental Contract No. 2-2009, Cameron Parish, Louisiana, Specification
|
Cameron Parish, LA
|
11/25/2008
|
TBD
|
|
W912P8-09-B-0029
|
Atchafalaya Basin, Gulf Intercoastal Waterway (GIWW) and Miscellaneous Projects, Cutterhead Dredge Rental No. 3-2009
|
Atchafalaya Basin, Gulf Intercoastal Waterway (GIW
|
1/22/2009
|
TBD
|
|
W912P8-09-B-0032
|
Passes of the Mississippi River, Southwest Pass, Maintenance Dredging, Contract No. 09-1, Approx Mile 5.5 AHP to Approx Mile 19.5 BHP, Approx C/L Station 2894+80 to Approx C/L Station 1094+00 (Non-Continuous)
|
Plaquemines Parish, LA
|
2/9/2009
|
TBD
|
|
W912P8-09-B-0033
|
Passes of the Mississippi River, Southwest Pass, Maintenance Dredging, Contract No. 09-2, Approx Mile 5.5 AHP to Approx Mile 19.5 BHP, Approx C/L Station 2894+80 to Approx C/L Station 1094+00 (Non-Continuous),
|
Plaquemines Parish, LA
|
2/9/2009
|
TBD
|
|
W912P8-09-B-0034
|
Passes of the Mississippi River, Southwest Pass, Maintenance Dredging, Contract No. 09-3, Approx Mile 5.5 AHP to Approx Mile 19.5 BHP, Approx C/L Station 2894+80 to Approx C/L Station 1094+00 (Non-Continuous),
|
Plaquemines Parish, LA
|
2/9/2009
|
TBD
|
|
W912P8-09-B-0041
|
Atchafalaya River Bay, Bar, Horseshoe and Misc. Projects, Cutterhead Dredge Rental No. 5-2009, OM-09-059
|
Atchafalaya River Bay, Bar, Horseshoe and Misc. Pr
|
3/23/2009
|
TBD
|
|
W912P8-09-B-0042
|
Atchafalaya River Bay, Bar, Horseshoe and Misc. Projects, Cutterhead Dredge Rental No. 6-2009, OM-09-060
|
Atchafalaya River Bay, Bar, Horseshoe and Misc. Pr
|
3/20/2009
|
TBD
|
|
W912P8-09-B-0045
|
Passes of the Mississippi River, Southwest Pass Maintenance Dredging, Cutterhead or Dustpan Rental No. 1-2009, Mile 5.0 AHP to Mile 19.5 BHP, C/L Sta. 2925+20 to C/L Sta. 1094+00 (Non-Continuous)
|
Plaquemines Parish, Louisiana
|
3/31/2009
|
TBD
|
|
W912P8-09-B-0047
|
Passes of the Mississippi River, Southwest Pass Maintenance Dredging, Cutterhead or Dustpan Rental No. 3-2009, Mile 5.0 AHP to Mile 19.5 BHP, C/L Sta. 2925+20 to C/L Sta. 1094+00 (Non-Continuous)
|
Plaquemines Parish, Louisiana
|
3/31/2009
|
TBD
|
|
W912P8-09-B-0052
|
Barataria Bay Waterway Maintenance Dredging, Bar Channel, No. 2-2009
|
Jefferson Parish, LA
|
5/26/2009
|
TBD
|
|
W912P8-09-B-0062
|
Waterway from Emipre LA to the Gulf of Mexico, Maintenance Dredging, C/L Sta. 28+00 to C/L Sta. 120+00, ED-06-106
|
Plaquemines Parish, LA
|
9/10/2009
|
TBD
|
|
W912P8-09-B-0064
|
Mississippi River Outlets, Vicinity of Venice, LA, Baptiste Collette Bar Channel, Maintenance Dredging #10-1, Plaquemines Parish, LA
|
Plaquemines Parish, LA
|
8/11/2009
|
TBD
|
|
W912P8-09-B-0065
|
Freshwater Bayou, Maintenance Dredging, Mile 1.3 to Mile 4.0
|
Vermillion Parish, LA
|
9/28/2009
|
TBD
|
|
W912P8-09-B-0072
|
Mississippi River, Baton Rouge to Gulf of Mexico, Louisiana FY-2009 Cutterhead Dredge Rental, Saltwater Barrier Sill
|
Plaquemines Parish, Louisiana
|
8/4/2009
|
TBD
|
|
W912P8-09-B-0086
|
Passes of the Mississippi River, South Pass Maintenance Dredging
|
Plaquemines Parish, LA
|
11/12/2009
|
TBD
|
W912P8-09-B-0071
Advanced Notice
|
Mermentau River - Gulf of Mexico, Maintenance Dredging, Centerline Station (-) 14+50 to Centerline Station 260+00, Mile 6.5 to Mile 1.3, Cameron Parish, LA
|
Cameron Parish, LA
|
TBD
|
W912P8-09-B-0074
Advanced Notice
|
Mississippi River Outlet Baptist Collette Bar Channel Dredging #10-2 C/L Sta. 300+00 to C/L Sta. 560+00 Plaquemines Parish, Louisiana ED 10-025
|
Venice, Louisiana
|
TBD
|
LPV52B-09-H-0038
l
Am:0004 10/17/2009
|
LPV, North of Airline Hwy, Levee - Reach 2B from Goodhope to Cross Bayou - Phase 2, LPV-05.2B
|
St. Charles Parish
|
Under Evaluation
|
| Professional Services |
|
W912P8-05-T-0056
|
FTIR Air Monitoring Equipment Services and System Application Support at Calcasieu Lock
|
Calcasieu Lock
|
4/29/2005
|
TBD
|
W912P8-07-R-0039
l
Am:0001 4/27/2007
|
Various Cultural Resources Investigations
|
Within the Limits of the New Orleans District
|
Under Evaluation
|
W912P8-08-R-0079
l
Am:0003 9/9/2008
|
MULTIDISCIPLINARY PLANNING SERVICES
|
New Orleans, LA
|
Under Evaluation
|
| Service and Supply |
W912P8-08-R-0022
l
Am:0004 8/7/2008
|
Supply & Deliver Earthen Clay Material for up to Three (3) Levee Reaches
|
St. Bernard Parish & New Orleans East, LA
|
Under Evaluation
|
|
W912P8-08-R-0072
|
Aquatic Vegetation Control
|
Southern Louisiana
|
Under Evaluation
|
|
W912P8-09-R-0033
|
Amphibious Self-Propelled DrillProbe Vehicle
|
|
Under Evaluation
|
|
W912P8-10-B-0036
|
HPO - Supply, Transport, Store and Maintain Various Lengths of Sheetpile
|
New Orleans, LA
|
11/20/2009
|
12/20/2009 2:00 P.M.
|
|
W912P8-10-B-0037
|
FY2010 Mat Casting
|
St. Francisville, LA
|
11/13/2009
|
12/15/2009 2:00 PM
|
W912P8-06-B-0109
l
Am:0003 11/16/2006
|
DRY DOCK - WHEELER
|
|
Under Evaluation
|
| Simplified Construction |
|---|
| Simplified Professional Services |
|---|
| Simplified Service and Supply |
|---|
| Sources Sought |